| | Recess the
Sill - For the ideal flush floor finish, recess
the Bi-fold sill into the floor as shown below. |
| | Sub-sill - We can fit the Bi-fold frame into a sub-sill if required. |
| | CAD Files
- Details on the recess required in the floor slab
can be found in the installation
& CAD Files section or in our Specifiers Manual.
We also offer CAD drawing files to Architects and
designers. Contact the product development department
by email design@awscommercial.com.au. |
| | Weather
Bar - In exposed locations we recommend that the
optional door bottom rail weather bar seal be fitted
as shown lower right. |





